Thornton Composite Reservoir - Connecting Tunnels & Gates

Thornton Composite Reservoir, CSA - Chicago IL
Client: Walsh Construction
Owner: Metropolitan Water Reclamation District of Greater Chicago

Scope of Work:On-site assembly and erection of 520 lineal feet of 30’ diameter tunnel liner as part of the Tunnel & Reservoir Project (TARP). Individual liner sections weighed as much as 182,000 pounds and were installed 340’ below grade.
Contract Value: $4,970,000
Final Contract Value: TBD
Completion Date: June 2014
View the Project Sheet

Biosolids Pelletization Facility

Stickney Water Reclamation Plant - Chicago IL
Client: Veolia Water North America
Owner: Metropolitan Water Reclamation District of Greater Chicago

Scope of Work: Prime Mechanical Contractor for emerging process technology facility that converts biomass waste into commercially viable fertilization products.
Contract Value: $53,000,000
Completion Date: 2008
View the Project Sheet

Pump Station & Spillway, North Detention Basin

O’Hare International Airport – Chicago IL
Client: Walsh Construction
Owner: City of Chicago, Department of Aviation

Scope of Work:Mechanical components and piping for new airfield detention basin and pumping station.
Contract Value: $827,000
Completion Date: January 2009
View the Project Sheet

Central Boiler Facility

Calumet Water Reclamation Plant – Chicago IL
Client: IHC Construction Companies, LLC
Owner: Metropolitan Water Reclamation District of Greater Chicago

Scope of Work: Furnish & install four 70,000 lb/hr water tube boilers, and associated piping, water treatment systems, controls, and instrumentation.
Contract Value: $12,250,000
Completion Date: June 2010
View the Project Sheet

Rehabilitation of Existing Influent Pumping Station

James C. Kirie Water Reclamation Plant – Chicago IL
Client: Rausch Construction Company, Inc.
Owner: Metropolitan Water Reclamation District of Greater Chicago

Scope of Work: Remove six sets of existing 36” piping and pumps in two 200’ deep wells and replace with four 35MGD and two 55MGD pumps and upgraded lined piping, new hydraulic system and new control room.
Contract Value: $6,600,000
Completion Date: January 2013

Improvements to Aeration Batteries

Calumet Water Reclamation Plant – Chicago IL
Client: F. H. Paschen, SN Nielsen & Associates, LLC
Owner: Metropolitan Water Reclamation District of Greater Chicago

Scope of Work:Remove and replace coarse air piping within three aeration batteries. Work completed during 30-day shutdowns. Sluice gate stem replacement and rehabilitation. Remove & replace existing polymer feed system piping, pumps, and bulk storage tanks.
Contract Value: $6,400,000
Completion Date: January 2011

Improvements in Imhoff & Sludge Thickening Areas

Stickney Water Reclamation Plant – Chicago IL
Client: Metropolitan Water Reclamation District of Greater Chicago
Owner: Metropolitan Water Reclamation District of Greater Chicago

Scope of Work: Miscellaneous improvements including instrumentation upgrades, replacement of air piping for sludge discharge tanks, replacement of existing screw conveyor, and cleaning of all primary settling tanks.
Contract Value: $3,900,000
Completion Date: October 2008

New Primary Settling Tanks & Grit Removal Facilities

Calumet Water Reclamation Plant – Chicago IL
Client: F. H. Paschen, SN Nielsen/IHC Construction, Joint Venture
Owner: Metropolitan Water Reclamation District of Greater Chicago

Scope of Work: Design, engineering, and construction of piping systems required to support a new $250 million primary Grit Removal and Settlement tank facility.
Contract Value: $16,300,000
Completion Date:August 2011
View the Project Sheet

Hydraulic Improvements

Calumet Water Reclamation Plant – Chicago IL
Client: IHC Construction / FHP Tectonics, A Joint Venture
Owner: Metropolitan Water Reclamation District of Greater Chicago

Scope of Work: Mechanical work for new wastewater pumping station and appurtenant facilities.
Contract Value: $6,175,000
Completion Date: December 2010
View the Project Sheet

Improvements at Aeration Batteries C & D and Imhoff Settling Tanks

Stickney Water Reclamation Plant – Chicago IL
Client: IHC Construction Companies, LLC
Owner: Metropolitan Water Reclamation District of Greater Chicago

Scope of Work: Rehabilitation of existing weir piping at settling tanks, remove and replace coarse air piping at Battery D, and rehabilitation of existing manholes and associated expansion joints.
Contract Value: $4,630,000
Completion Date: September 2012